Visual Materials
Worker housing at construction camp #29 - used in the construction of Shaver Tunnel for PH 2 & 2a, showing the prefabricated redwood bunk
You might also be interested in

Shaver tunnel. Adit #5. Tent Camp 19
Visual Materials
Shaver tunnel. Adit #5. Tent Camp 19 - used in the construction of Shaver Tunnel for Powerhouse 2 & 2a.
photCL SCE 02 - 05760

Shaver Lake Dam during construction
Visual Materials
Shaver Lake Dam during construction. Tunnel portal looking towards Dam 2 from Camp 71.
photCL SCE 02 - 14069

Huntington-Shaver Tunnel - S & W repairs
Visual Materials
Huntington-Shaver Tunnel - S & W repairs - Adit at Camp 72 and outlet.
photCL SCE 02 - 25788

Big Creek, Huntington-Pitman-Shaver Diversion
Visual Materials
Big Creek, Huntington-Pitman-Shaver Diversion - Construction of the Recreation Hall for Camp 73 at the outlet for the Huntington Shaver Tunnel.
photCL SCE 02 - 12882
Image not available
This sketch shows the relative locations of the four tunnel camps located along the Florence Lake Tunnel construction project
Visual Materials
This sketch shows the relative locations of the four tunnel camps located along the Florence Lake Tunnel construction project.
photCL SCE 12 - 00136
