Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Big Creek Powerhouse #8



You might also be interested in

  • Big Creek - Powerhouse #8 (part 1)

    Big Creek - Powerhouse #8 (part 1)

    Visual Materials

    Big Creek - Powerhouse #8 (part 1) [Powerhouse 8, Dam 6, Camp 34, Camp 38, overview PH8 & penstock, milling PH8 draft tube, operator's cottage, forebay, sluicing tailrace, generator floor, switchboard, rocks washed into tailrace after penstock burst, Unit #2 at Pelton Water Wheel Co., generator & governor at PH8, penstock vent, transformers & bus, station power sets, switchboard, broken penstock, drilling tunnel #8, repaired penstock, steel forebay, Camp 32 Cookhouse, Johnson Valve, Camp 33.]

    photCL SCE 13 - vol 034

  • Big Creek Powerhouse #8

    Big Creek Powerhouse #8

    Visual Materials

    Big Creek Powerhouse #8 - [Francis type Generator in Powerhouse 8]

    photCL SCE 02 - 07384

  • Big Creek Powerhouse #8

    Big Creek Powerhouse #8

    Visual Materials

    Big Creek Powerhouse #8 - General building [generator room with partial covering of powerhouse with temporary corrigated metal panels. Most of these panels were washed away when the penstock ruptured 18 days later.]

    photCL SCE 02 - 07313

  • Big Creek Powerhouse #8

    Big Creek Powerhouse #8

    Visual Materials

    Big Creek Powerhouse #8 - Mucking out tailrace for Unit #2

    photCL SCE 02 - 29240

  • Big Creek Powerhouse #8

    Big Creek Powerhouse #8

    Visual Materials

    Big Creek Powerhouse #8 - Two vertical axis turbine generators on generator floor of powerhouse 8.

    photCL SCE 02 - 17020

  • Big Creek Powerhouse #8

    Big Creek Powerhouse #8

    Visual Materials

    Big Creek Powerhouse #8 - Monitor used to sluice muck out of tailrace.

    photCL SCE 02 - 07365