Visual Materials
Big Creek Powerhouse #8
You might also be interested in

Big Creek - Powerhouse #8 (part 2)
Visual Materials
Big Creek - Powerhouse #8 (part 2) [Powerhouse #8 - Diversion, excavation for powerhouse, diversion tunnel construction, interior shots of PH #8 (transformers, control room, turbine-generator assembly, station power, Johnson Valve, turbine runner, crane assembly, scroll case assembly, draft tube); Penstock rupture - ripped Penstock, flattened pipe, damage to powerhouse and other facilities, reshaping pipe, adding reinforcing bands to high stress sections of penstock; Camp 33, operator dormitory, substation, incline construction.]
photCL SCE 13 - vol 035

Big Creek Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - Pumps & tanks for oil pressure governor control.
photCL SCE 02 - 10114

Big Creek Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - Operator at D.C. switchboard in Powerhouse #8 Big Creek
photCL SCE 02 - 07375

Big Creek Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - Two vertical axis turbine generators on generator floor of powerhouse 8.
photCL SCE 02 - 17020

Big Creek Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - [Francis type Generator in Powerhouse 8]
photCL SCE 02 - 07384

Big Creek Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - Shot of Powerhouse 8 [with all of the concrete work done on the Generator room and framing still up on the transformer room.]
photCL SCE 02 - 07312