Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Big Creek Powerhouse 2a



You might also be interested in

  • Big Creek - Powerhouse #2 & 2a (part 3)

    Big Creek - Powerhouse #2 & 2a (part 3)

    Visual Materials

    Big Creek - Powerhouse #2 & 2a (part 3) [Construction at Powerhouse 2A, manufacturing photos showing the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at PH 2A.]

    photCL SCE 13 - vol 031

  • Powerhouse 2a

    Powerhouse 2a

    Visual Materials

    Powerhouse 2a - Looking downstream at Powerhouse #2, showing the structural steel work of PH #2A.

    photCL SCE 02 - 14734

  • Image not available

    Big Creek: Powerhouse No. 2 and 2a (part 3)

    Visual Materials

    Photographs of Powerhouse 2 and 2A, Part Three. Construction at Powerhouse 2A, images depicting the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at Powerhouse 2A.

    photCL SCE

  • Powerhouses 2&2A

    Powerhouses 2&2A

    Visual Materials

    Powerhouses 2&2A - Switchyard excavation.

    photCL SCE 02 - 28334

  • Big Creek PH 2A

    Big Creek PH 2A

    Visual Materials

    Big Creek PH 2A - "Y" branch penstock section for Pelton leg.

    photCL SCE 02 - 22935

  • Big Creek - Powerhouse #2, & 2a - maintenance

    Big Creek - Powerhouse #2, & 2a - maintenance

    Visual Materials

    Big Creek - Powerhouse #2, & 2a - maintenance [Exterior shots of PH #2, full shot of PH 2 & 2A, generator floor in PH 2, Unit 6 bucket failure (PH2) with close-ups of damage, damage to overhead crane from flying #10 bucket, PH 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gatehouse, penstock "Y"s, rotor installation, PH2 Unit 3 winding failure, broken buckets]

    photCL SCE 13 - vol 044