Visual Materials
Big Creek, Florence Lake Dam
You might also be interested in

Big Creek, Florence Lake Dam - View showing details of shop-built, panel
Visual Materials
Big Creek, Florence Lake Dam - View showing details of shop-built, panel-type extrados forms, and built-in-place intrados forms on Arches 13 &14; also forms for Buttresses 12, 13 &14. [Intrados reinforcing steel has been placed for Arch 13. Buttress head reinforcing also shown for junction between Arches 13-14 and 14-15.]
photCL SCE 02 - 12660

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Closer view of arch and buttress construction in river section, looking west from approximately the upstream face of arch 56. (Intrados forms for Arch 49 and completed footing trench for Arch 50 are shown in background.
photCL SCE 02 - 12767

Big Creek, Florence Lake Dam - Middle section
Visual Materials
Big Creek, Florence Lake Dam - Middle section - View of site of west portion of middle section of dam, looking northwest from near the spillway location. (Concrete testing laboratory, machine and compressor shop, and cement warehouse are shown in background. Excavation for Arch and Buttress foundation is shown in progress; also first buttress form. Tramway is shown between excavation and buildings.
photCL SCE 02 - 12855

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - View of Intrados Arch #25, also west side of Angle Buttress #25.
photCL SCE 02 - 22060

Big Creek, Shaver Lake Dam - Shaver Lake Dam - Pouring foundation
Visual Materials
Big Creek, Shaver Lake Dam - Shaver Lake Dam - Pouring foundation. South abutment excavation, early concrete work, and construction plant for Shaver Dam in the fall of 1926. Mixing plant and aggregate handling trestle in middle foreground. Single-compartment chuting towers at right and left. Double-compartment tower in center. (B458)
photCL SCE 02 - 22942

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Record photo of upstream face of Arches 11 to 25 inclusive in second tangent. Arch #13 covered with sheet steel membrane during June 1942 and Arch #12 covered with J-M Asbestile waterproofing during Nov. 1942.
photCL SCE 02 - 24863