    Boulder-Chino Transmission Line

    Visual Materials

    Boulder-Chino Transmission Line - Gas truck at Boulder City.

    photCL SCE 02 - 20235

  • Boulder-Chino Transmission Line

    Boulder-Chino Transmission Line

    Visual Materials

    Boulder-Chino Transmission Line - F.W.D. Steel truck

    photCL SCE 02 - 20245

  • Boulder-Chino Transmission Line

    Boulder-Chino Transmission Line

    Visual Materials

    Boulder-Chino Transmission Line - [filling dump truck with gravel.]

    photCL SCE 02 - 19887

  • Boulder-Chino Transmission Line (2nd)

    Boulder-Chino Transmission Line (2nd)

    Visual Materials

    Boulder-Chino Transmission Line (2nd) - Placing concrete from ready mix truck at location M212-T2.

    photCL SCE 02 - 23259

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Showing excavation of soil at and between towers 1 to 2 at mile 103. Also showing existing slope of ground. Vertical rod at 5.5', horizontal rod at 8.9'. Rods on centerline, facing northwesterly.

    photCL SCE 02 - 27890

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - showing excavation of soil at and between towers 1 to 2 at mile 103. Detail of vertical bank facing north. Material below 1.3' is fine gravel. Material above is clay. Bank about 8.5' high.

    photCL SCE 02 - 27893