Visual Materials
Boulder-Chino Transmission Line (2nd)
You might also be interested in

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Making up conductor dead-end connection.
photCL SCE 02 - 23550

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Tensioning Conductor at M91-T2.
photCL SCE 02 - 23267

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting bridge with insulators attached at M142-T2
photCL SCE 02 - 23271

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Placing concrete from ready mix truck at location M212-T2.
photCL SCE 02 - 23259

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Drilling holes for concrete piles in Vineyard at location M218-T2.
photCL SCE 02 - 23261

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting tower by hand using a 25 foot Floating Gin Pole at Tower M202-T2.
photCL SCE 02 - 23537