Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Chino-Laguna Bell Transmission Line



You might also be interested in

  • Long Beach-Lighthipe-Laguna Bell Transmission Line

    Long Beach-Lighthipe-Laguna Bell Transmission Line

    Visual Materials

    Long Beach-Lighthipe-Laguna Bell Transmission Line - Driving Piles for tower footings.

    photCL SCE 02 - 14142

  • Chino-Laguna Bell Transmission Line

    Chino-Laguna Bell Transmission Line

    Visual Materials

    Chino-Laguna Bell Transmission Line - Hand excavation for earth type tower footings.

    photCL SCE 02 - 23557

  • Chino-Laguna Bell Transmission Line

    Chino-Laguna Bell Transmission Line

    Visual Materials

    Chino-Laguna Bell Transmission Line - Placing concrete for cast-in-place tower footings.

    photCL SCE 02 - 23555

  • Chino-Laguna Bell Transmission Line

    Chino-Laguna Bell Transmission Line

    Visual Materials

    Chino-Laguna Bell Transmission Line - Excavating for earth type tower footings at location 115.

    photCL SCE 02 - 23547

  • Chino-Laguna Bell Transmission Line

    Chino-Laguna Bell Transmission Line

    Visual Materials

    Chino-Laguna Bell Transmission Line - Assembling tower steel on ground for erection at M33-T2.

    photCL SCE 02 - 23554

  • Image not available

    Transmission lines: Vincent, Lighthipe-Chino, Long Beach, Big Tujunga

    Visual Materials

    Transmission Lines, including Brea Camp on the Lighthipe-Chino 66kV transmission line, mess hall, kitchen, hospital tent; Long Beach-Lighthipe-Laguna Bell transmission line, including multi-circuit tower construction, driving piles for tower foundations, collapsed Long Beach transmission line tower; Vincent 220kV transmission line, including road building, Construction Camps 2, 3, 6, 8, 9, and 10, Camp 6 kitchen and mess hall, Maple Canyon, Big Tujunga, transporting tower materials, tractors pulling graders, pack trains, building towers, pulling cable, cable splicing.

    photCL SCE