Big Creek Powerhouse #3 - Progress picture taken from house 13 looking toward site of houses 7 to 12 inclusive. [Sewer and water line tunnel excavated in road in front of these houses. Water and sewer pipe strung out along trench, ready for installation.]
photCL SCE 02 - 41615

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Progress picture looking east from house 16, showing excavated bench for houses 17 to 24 inclusive. [Sewer and water line trench excavated in road in front of these houses.]
photCL SCE 02 - 41616

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Looking east toward house sites 1 to 4 from point on road to west of 1. In background grading in vicinity of house site #30.
photCL SCE 02 - 40320

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Progress picture taken from in front of house site 5, looking at nearly completed excavation for houses 1 to 4 and road in front.
photCL SCE 02 - 40330

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - View of springs under house site #7. Crushed rock for french drain installation prior to building up approximately 8 ft. of fill to house elevation.
photCL SCE 02 - 40331

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - S. J. & E. Train [Locomotive #107] at Hairpin (Camp 39) with pipe sections for the upper portion of the Powerhouse #3 penstocks. The 3rd, 4th, & 5th cars are of the "Strongback" type, and are equipped to be lowered down the penstock incline with only minor additional tying.
photCL SCE 02 - 09407