Portal Powerhouse - Temporary backing to reduce vibration in 3/8" plate bulkhead in turbine Wye branch inadequate; it was replaced with concrete disc back by I-beams.
photCL SCE 02 - 43898

Portal Powerhouse
Visual Materials
Portal Powerhouse - Installing temporary 3/8" plate bulkhead at end of turbine branch of penstock inside structure.
photCL SCE 02 - 43777

Portal Powerhouse
Visual Materials
Portal Powerhouse - Failure of Steel splitter in Penstock Wye section.
photCL SCE 02 - 44584

Portal Powerhouse
Visual Materials
Portal Powerhouse - Close-up of splitter along bottom weld in Penstock Wye.
photCL SCE 02 - 44585

Portal Powerhouse
Visual Materials
Portal Powerhouse - Flow from outlet at 1000 cfs. into Wye branch.
photCL SCE 02 - 43886

Portal Powerhouse
Visual Materials
Portal Powerhouse - Placing concrete in supporting wall under end of 12' diameter pipe. Excavating old concrete anchor. [Forming new] foundation & Wye branch anchor.