Powerhouse 2 & 2A

1 of 2


You might also be interested in

  • Mammoth Pool Powerhouse

    Mammoth Pool Powerhouse

    Visual Materials

    Mammoth Pool Powerhouse - during penstock installation [color trans., with 1 variant]

    photCL SCE 08 - 00370

  • Image not available

    Big Creek Powerhouse No. 2 and 2A, Maintenance

    Visual Materials

    Exterior shots of Powerhouse No. 2, full shot of Powerhouse 2 and 2A, generator floor in Powerhouse 2, Unit 6 bucket failure (Powerhouse 2) with close-ups of damage, damage to overhead crane from flying No. 10 bucket, Powerhouse 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gate house, penstock "Y"s, rotor installation, Powerhouse 2.

    photCL SCE

  • Powerhouse 2 & 2A

    Powerhouse 2 & 2A

    Visual Materials

    Powerhouse 2 & 2A - Switchyard excavation.

    photCL SCE 02 - 28336

  • Powerhouse 2 & 2A

    Powerhouse 2 & 2A

    Visual Materials

    Powerhouse 2 & 2A - Switchyard excavation progress.

    photCL SCE 02 - 28345

  • Powerhouse 2 & 2A

    Powerhouse 2 & 2A

    Visual Materials

    Powerhouse 2 & 2A - Grading for switchyard.

    photCL SCE 02 - 28350

  • Powerhouse 2 & 2A

    Powerhouse 2 & 2A

    Visual Materials

    Powerhouse 2 & 2A - Excavating upper part of Big Creek #2 Switchyard.

    photCL SCE 02 - 28346