    Big Creek: Tunnels

    Visual Materials

    Tunnels 1, 3, and 8, including intake construction at Tunnel 3, portal adit Camp 36, Camp 35 adit, outlet portal, Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to sluicing water at outlet, guests standing in 18' penstock, sluicing tunnel; Stevenson Creek, Camps 33, 34, 35, 36, 37 and 38 compressors, Camp 38 mess hall, Camp 33; Cascada - Baldwin 15 ton locomotive No. 4; Tunnel 8 construction, Adit 1; Intake at Dam 1 repairs.

    photCL SCE

  • Image not available

    F.P.C. Vol. 3, Projects 67 and 120 - Construction of Big Creek Powerhouse 3 and construction camps

    Visual Materials

    Construction of Powerhouse 3 and construction camps 1 to 54. Views include Tunnel 3, including intake construction, portal adit Camp 36, Camp 35 adit, outlet portal; Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to railroad sluicing water at outlet; Tunnel 3 excavation; Surge chamber construction; Construction views of Powerhouse 3, installation of 3 penstocks, turbine and generator installations at No. 3; Construction of 220kV switchyard.

    photCL SCE

  • Big Creek - Powerhouse #8 (part 1)

    Big Creek - Powerhouse #8 (part 1)

    Visual Materials

    Big Creek - Powerhouse #8 (part 1) [Powerhouse 8, Dam 6, Camp 34, Camp 38, overview PH8 & penstock, milling PH8 draft tube, operator's cottage, forebay, sluicing tailrace, generator floor, switchboard, rocks washed into tailrace after penstock burst, Unit #2 at Pelton Water Wheel Co., generator & governor at PH8, penstock vent, transformers & bus, station power sets, switchboard, broken penstock, drilling tunnel #8, repaired penstock, steel forebay, Camp 32 Cookhouse, Johnson Valve, Camp 33.]

    photCL SCE 13 - vol 034

  • Big Creek Powerhouse #3 - Tunnel #3 outlet portal

    Big Creek Powerhouse #3 - Tunnel #3 outlet portal

    Visual Materials

    Big Creek Powerhouse #3 - Tunnel #3 outlet portal - excavation for manifold - Camp 37 in background.

    photCL SCE 02 - 08559

  • Big Creek - Shaver Lake #1

    Big Creek - Shaver Lake #1

    Visual Materials

    Big Creek - Shaver Lake #1 [Shaver Dam construction - original lake bed, logging area of expansion, blacksmith shop, weirs at sawmill, Shaver Lake office and mess hall, original dam, surveys for new dam, Shaver tunnel, Shaver flume from old dam entering tunnel, Eley Creek diversion, intake, penstock, spillway, Adit 8 excavation, flushing tunnel outlet, Shaver Lake Railroad, Camp 11, lumber operations, Camp 19, Shaver cookhouse fire, dismantling Shaver railroad.]

    photCL SCE 13 - vol 037

  • Image not available

    Big Creek: Powerhouse No. 8 (part 1)

    Visual Materials

    Powerhouse No. 8, Part One. Photographs of Dam 6, Camp 34, Camp 38, overview of Powerhouse 8 and penstock, milling Powerhouse 8 draft tube, operator's cottage, forebay, sluicing tailrace, generator floor, switchboard, rocks washed into tailrace after penstock burst, Unit No. 2 at Pelton Water Wheel Co., generator and governor at Powerhouse 8, penstock vent, transformers and bus, station power sets, switchboard, broken penstock, drilling tunnel No. 8, repaired penstock, steel forebay, Camp 32 cook house, Johnson Valve, Camp 33.

    photCL SCE