Visual Materials

Condenser installation



You might also be interested in

  • Image not available

    Long Beach Steam Station No. 2 and No. 3

    Visual Materials

    Condenser installation, stacks, south elevation poured, turbo installations, turbo room construction, boiler room construction, bricking the boilers, exterior shot complete with 8 stacks on Plant 2, control room. Piles placed for Plant 3 construction, moving above ground fuel storage tank by floating.

    photCL SCE

  • Image not available

    Long Beach Steam Station

    Visual Materials

    Long Beach Steam Station - Plant 3 construction photos, superheater, header, boiler assembly, skylight over Turbo Room, flu opening, stacks, view of all 3 plants, installing 83 ton transformers, Turbine Room interior, circulating water pumps, condenser installation, boiler interior, aerials of station, concrete girder reinforcement, exciter, oil switches, switch garden, control house, screen wells.

    photCL SCE 13 - vol 094

  • Image not available

    End of construction of Long Beach Steam Plant #1

    Visual Materials

    End of construction of Long Beach Steam Plant #1 - turbine installations, control rooms, transformers, cooling water system, plant start-up; and start of construction for Plant #2 - excavation, driving piles for Plant 2 foundation.

    photCL SCE 13 - vol 085

  • Image not available

    Long Beach Steam Station No. 3

    Visual Materials

    Long Beach Steam Station No. 3 construction, including superheater, header, boiler assembly, skylight over Turbo Room, flue opening, stacks, view of all 3 plants, installing 83 ton transformers, Turbine Room interior, circulating water pumps, condenser installation, boiler interior, aerials of station, concrete girder reinforcement, exciter, oil switches, switch garden, control house, screen wells.

    photCL SCE

  • Image not available

    Long Beach Steam Station No. 3

    Visual Materials

    Long Beach Steam Station No. 3 turbo installation, Boiler No. 50, laying 15" gas main, driving piles for Unit No. 11, take-off towers, towers at channel crossing, installing transformers and oil switches, switching garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab, fuel oil pump room, exciter, piles ready for steel.

    photCL SCE

  • Long Beach Steam Station, Plant #3 - Close-up of stator, turbo and condenser

    Long Beach Steam Station, Plant #3 - Close-up of stator, turbo and condenser

    Visual Materials

    Long Beach Steam Station, Plant #3 - Close-up of stator, turbo and condenser.

    photCL SCE 02 - 16736