Visual Materials
On March 28, 1985, the first of the two massive girders for the overhead crane in Balsam Meadow's underground powerhouse was raised into position
You might also be interested in

In December 1985. the Balsam Meadow Project reached its halfway mark with the "holing through" of the Tailrace Tunnel
Visual Materials
In December 1985, the Balsam Meadow Project reached its halfway mark with the "holing through" of the Tailrace Tunnel. Here, surrounded by solid granite 400 feet below the snow-covered Sierras, Edison's Balsam Meadow Project Manager Don Brundage (right), congratualtes Dillingham-Atkenson Project Manager Richard L. Kunz on completion of the final tunneling work for the project.
photCL SCE 12 - 00219
Image not available
Eastwood Powerhouse crane lifts the 105 ton "turbine shutoff valve" off its transporter trailer inside the power station
Visual Materials
Eastwood Powerhouse crane lifts the 105 ton "turbine shutoff valve" off its transporter trailer inside the power station, in preparation to place it into its final location. This massive valve is used to close off the pipe carrying water from the power tunnels into the turbine, primarily whenever maintenance work must be performed on the turbine or generator.
photCL SCE 12 - 00217