Visual Materials
Operator Bill Howardson monitors plant machinery and system electric demand in the control room at Long Beach Steam Plant No
You might also be interested in

Long Beach Steam Station, Plant #3 - Fan Room - auto control
Visual Materials
Long Beach Steam Station, Plant #3 - Fan Room - auto control - Bailey M. Co.
photCL SCE 02 - 15594

Boilermen at Long Beach #2 Steam Plant light off the gas burners as the plant "steams up" to carry load
Visual Materials
Boilermen at Long Beach #2 Steam Plant light off the gas burners as the plant "steams up" to carry load. Pg. 195.
photCL SCE 11 - 00389

The Jordan Hydro Plant operator on duty, 1911
Visual Materials
The Jordan Hydro Plant operator on duty, 1911. He is sitting with attention on the switchboard meters, and with a hand on the exciter needle-valve control, ready to respond to quick changes in demand. Pg. 74.
photCL SCE 11 - 00153

San Bernardino Steam Plant - Control room
Visual Materials
Steam & Hydro Power - Old San Bernardino Steam Plant - Control room and switchboards
photCL SCE 07 - 00438

San Bernardino Steam Plant - Control room
Visual Materials
Steam & Hydro Power - Old San Bernardino Steam Plant - Control room and switchboards
photCL SCE 07 - 00439

Long Beach Steam Plant #3 - 2nd floor or Switchboard Room
Visual Materials
Long Beach Steam Plant #3 - 2nd floor or Switchboard Room - Control Building. 3
photCL SCE 02 - 15044