The Arizona Powerhouse at Hoover Dam, showing installation in 1943 of Unit No
You might also be interested in
![The second of three views of the installation of Unit A-5 at Hoover Dam [Arizona side] in 1943](/_next/image?url=https%3A%2F%2Frail.huntington.org%2FIIIF3%2FImage%2F22APN4VLBI3S%2Ffull%2F%5E360%2C%2F0%2Fdefault.jpg&w=750&q=75)
The second of three views of the installation of Unit A-5 at Hoover Dam [Arizona side] in 1943
Visual Materials
The second of three views of the installation of Unit A-5 at Hoover Dam [Arizona side] in 1943. Pg. 189.
photCL SCE 11 - 00377
![The first of three views of the installation of Unit A-5 at Hoover Dam [Arizona side] in 1943](/_next/image?url=https%3A%2F%2Frail.huntington.org%2FIIIF3%2FImage%2F22APN4VLET0J%2Ffull%2F%5E360%2C%2F0%2Fdefault.jpg&w=750&q=75)
The first of three views of the installation of Unit A-5 at Hoover Dam [Arizona side] in 1943
Visual Materials
The first of three views of the installation of Unit A-5 at Hoover Dam [Arizona side] in 1943. Pg. 189.
photCL SCE 11 - 00376

A sightseeing boat gives an idea of the grand scale of Hoover Dam
Visual Materials
A sightseeing boat gives an idea of the grand scale of Hoover Dam. Pg. 191.
photCL SCE 11 - 00382

This aerial view shows Hoover Dam, the intake towers, the spillways, and, in the upper right, the electrical substation
Visual Materials
This aerial view shows Hoover Dam, the intake towers, the spillways, and, in the upper right, the electrical substation. Pg. 186.
photCL SCE 11 - 00370

Hoover Dam about three-fourths done, early 1935
Visual Materials
Hoover Dam about three-fourths done, early 1935. Pg. 188.
photCL SCE 11 - 00373

Unit #3 at Alamitos Generating Station, showing the experimental bag filter house built in the early 1960s
Visual Materials
Unit #3 at Alamitos Generating Station, showing the experimental bag filter house built in the early 1960s. Pg. 229.
photCL SCE 11 - 00463