Visual Materials

Camp at Watts Valley. ; Camp #8, Big Tujunga Canyon. ; J. C. Christy & Crew at Bakersfield



You might also be interested in

  • Image not available

    Transmission lines: Vincent, Lighthipe-Chino, Long Beach, Big Tujunga

    Visual Materials

    Transmission Lines, including Brea Camp on the Lighthipe-Chino 66kV transmission line, mess hall, kitchen, hospital tent; Long Beach-Lighthipe-Laguna Bell transmission line, including multi-circuit tower construction, driving piles for tower foundations, collapsed Long Beach transmission line tower; Vincent 220kV transmission line, including road building, Construction Camps 2, 3, 6, 8, 9, and 10, Camp 6 kitchen and mess hall, Maple Canyon, Big Tujunga, transporting tower materials, tractors pulling graders, pack trains, building towers, pulling cable, cable splicing.

    photCL SCE

  • Camp #7. ; Camp #8. ; Wrapping poles

    Camp #7. ; Camp #8. ; Wrapping poles

    Visual Materials

    A - Camp #7. B - Camp #8. C - Wrapping poles.

    photCL SCE 10 - 00126

  • Stub hole excavating gang, Camp #3.  ; Stub hole excavating crew, lunch.  ; Tower M0T2,  blasting for foundation

    Stub hole excavating gang, Camp #3. ; Stub hole excavating crew, lunch. ; Tower M0T2, blasting for foundation

    Visual Materials

    A - Stub hole excavating gang, Camp #3. B - Stub hole excavating crew, lunch. C - Tower M0T2, blasting for foundation.

    photCL SCE 10 - 00108

  • Big Creek Powerhouse #8

    Big Creek Powerhouse #8

    Visual Materials

    Big Creek Powerhouse #8 - Hospital at Big Creek Camp #33

    photCL SCE 02 - 07149

  • Big Creek Powerhouse #8

    Big Creek Powerhouse #8

    Visual Materials

    Big Creek Powerhouse #8 - Compressors for tunnel driving at Camp 33.

    photCL SCE 02 - 08916

  • Big Creek Powerhouse #8

    Big Creek Powerhouse #8

    Visual Materials

    Big Creek Powerhouse #8 - View of Camp 33, Powerhouse #8, and Dam #6 at the peak of PH8 construction. Work just started on Tunnel 3 Intake structure.

    photCL SCE 02 - 08299