Visual Materials
Mount Whitney Power Co. photographs of Visalia and Porterville in Tulare County, California
You might also be interested in
Image not available
Mount Whitney Power Co.: substations and powerhouses
Visual Materials
Lindsay Substation; Delano Substation; Visalia Steam Plant; Construction of Kaweah No. 1, No. 2, and Kaweah No. 3; Wolverton; Visalia Garage; Tulare Substation and Waterworks; Mount Whitney Power Co. general office in Visalia; Tule diversion dam and Intake, Marble Fork Camp, and construction of Tule flumes, canals, forebay, and powerhouse.
photCL SCE
Image not available
California Electric Power Corp. - Nevada-California Electric Corp.: Photographs of Owens Valley and Las Vegas, Nevada
Visual Materials
Intake 2, Dam construction at Lake Sabrina and South Lake, Plant 2 and cottages, Plant 4, recreation building, Plant 5, Silver Peak Substation, Las Vegas train station and surrounding town.
photCL SCE
Image not available
California Electric Power Corp. - Nevada-California Electric Corp.: progress reports
Visual Materials
Photographs of Rhyolite Substation, Temescal Rock Company Substation, Banning Substation; Bishop Creek hydroelectric Plant No. 2, No. 3, No. 4, No. 5; Reservoir No. 1 [South Lake or Lake Sabrina], Equalizing Reservoir [Intake 2] showing proposed position of Plant No. 1, Control Station, and Cottages; Substations and Transmission Lines, including Victorville, Ransburg, Tonopah, Goldfield, Alkali, Manhattan, Elsinore, El Centro, and San Bernardino; Otay Dam and Reservoir.
photCL SCE
Image not available
California Electric Power Corp. - Nevada-California Electric Corp.: Bishop Creek hydroelectric project
Visual Materials
Intake 2 Reservoir on North Fork Bishop Creek, Dam site - Reservoir No. 2, Lake on Middle Fork of Bishop Creek (Reservoir No. 1), dam site Reservoir No. 1, dam and intake, wood stave flowline, construction of a Bishop Creek Powerhouse [looks like Plant No. 4].
photCL SCE
Image not available
Big Creek construction, Kern River, Redondo Steam Station, etc
Visual Materials
Azusa Line; Big Creek construction - Dam 2, towers, Powerhouse 2, Richgrove Patrol Sta.; Borel change to Pelton-Francis horizontal turbines, break in canal, Bodfish Flume, repairs at Schoolhouse Cut, Profanity Flume; San Bernardino "C" Street Substation, Long Beach Steam Plant, Santa Ana River 2; Fillmore Substation; PLandP trucks and wagons; Huntington Beach Substation; East Kern Line; Kern Canal, settling basin, Borel Powerhouse; Mentone - siphon, flume break, fish screen, intake; L.A. City Power Dev. Plant 1; Pedley Powerhouse - break in canal; Redondo Steam Plant; Sierra Powerhouse; Stone Castle, Vernon Substation, Santa Paula Substation, Monolith Substation, and Eagle Rock Substation.
photCL SCE
Image not available
Kaweah hydro-electric plants 1 and 2; Mount Whitney Power Co. maps and photos of hydro-electric development on the Kaweah River
Visual Materials
Album belonging to Robert McF. Doble, Consulting Engineer, and containing a map and photographs of hydroelectric development on the Kaweah River. Photographs include proposed site for Powerhouse No. 2, Middle Fork Kaweah River at National Park line, Atwell's Mill, Upper and Lower Monarch Lakes, cut at headworks of ditch for Plant No. 2, East Fork Kaweah River at National Park line, Junction of Marble and Middle Forks of Kaweah River, Eagle Lake, Lady Franklin Lake, Silver Lake. A typescript index appears at the end of the album. "Robert McF. Doble, Construction Engineer" stamped on cover.
photCL SCE