Visual Materials

C1.3 - Maps - Drawing



You might also be interested in

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Profile drawing of the existing Big Creek Project for the 1927 Annual Report. [Drawing shows Powerhouses 1, 2, 2A, 8 and 3; Florence Lake, Huntington Lake, Shaver Lake and their associated tunnel systems; and the Mono Creek & Bear Creek Diversions].

    photCL SCE 02 - 14129

  • C1.3 - Maps - Drawing

    C1.3 - Maps - Drawing

    Visual Materials

    C1.3 - Maps - Drawing - "Pagett" Big Creek Project [includes several powerhouses that were never built]

    photCL SCE 02 - 10613

  • Map of Big Creek No. 8 Development for Val. Dept

    Map of Big Creek No. 8 Development for Val. Dept

    Visual Materials

    Map of Big Creek No. 8 Development for Val. Dept. - includes location of Powerhouses 8, 2, & 2a, Dams 5 & 6, Tunnel 8, Camps 7, 31, 32, 33, & 42, penstock, transmission lines, roads and railroads.

    photCL SCE 02 - 16223

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Map of Edison Transmission Lines and System for Annual Report. [drawing of Powerhouse 2 & 2A is shown as a mirror image]

    photCL SCE 02 - 16606

  • Big Creek Powerhouse 2a

    Big Creek Powerhouse 2a

    Visual Materials

    Big Creek Powerhouse 2a - Showing foundation and tructural steel going up for PH #2A. The excavation for the Penstock is showing to good advantage in this photo also the road behind Powerhouses #2 and #2A.

    photCL SCE 02 - 14730

  • View of Big Creek Powerhouses #2 and 2A from across the forebay at waters edge

    View of Big Creek Powerhouses #2 and 2A from across the forebay at waters edge

    Visual Materials

    View of Big Creek Powerhouses #2 and 2A from across the forebay at waters edge.

    photCL SCE 05 - 54819