Visual Materials

Big Creek, Florence Lake Dam



You might also be interested in

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Arch #13 progress picture showing installation of steel facing. Ironhide prime coat and 1st. coat of aluminum reflecting coat over lower portion. .

    photCL SCE 02 - 24706

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Extrados of Arch #13 after all chipping and scaling of loose and disintegrated concrete was completed in preparation for the installation of steel facing.

    photCL SCE 02 - 24198

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Arch #13 Skylining 5'x8' sheets from ground to scaffold. Steel facing on arch.

    photCL SCE 02 - 24709

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Progress photo showing Bryant crew applying asbestile plastic to lower portion of Arch No. 51.

    photCL SCE 02 - 24816

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - One of the four 1.5" diameter drains through the arch approximately 1' above the lower horizontal key before covering with facing steel. Pipes were sulfured and grouted in. 1.5" iron stop cocks were placed on the downstream ends of the pipes.

    photCL SCE 02 - 24703

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Arch #13 Close-up of lower horizontal seal completed.

    photCL SCE 02 - 24704