Long Beach Steam Station, Plant #2 - Forms & steel east footing 8-R
You might also be interested in

Long Beach Steam Station, Plant #2
Visual Materials
Long Beach Steam Station, Plant #2 - Forms & steel, east footing of Unit 8-R [Plus three additional shots on construction of 8-R (#25414: progress 8-R, #25418: holes cut in concrete to remove material sent to Russia, & #25419: typical cement dust coating on Plant #2 equipment) on same photocard].
photCL SCE 02 - 25413

Long Beach Steam Station, Plant #2 - Progress construction of 8-R
Visual Materials
Long Beach Steam Station, Plant #2 - Progress construction of 8-R [Plus three additional shots - #25398: Removing coupling & 20th stage wheel from #7 turbine, #25399 & #25400: Units 7 & 8 removal) on same photocard].
photCL SCE 02 - 25397

Long Beach Steam Station, Plant #2
Visual Materials
Long Beach Steam Station, Plant #2 - Progress construction of Unit 8-R [Plus three additional shots on construction of 8-R (#25410, #25411, & #25412) on same photocard].
photCL SCE 02 - 25409

Long Beach Steam Station, Plant #2 - Unit 8-R
Visual Materials
Long Beach Steam Station, Plant #2 - Unit 8-R - Generator sole plates & low pressure end of turbine. [Plus additional shot (#25446: Unit 8-R construction progress) on same photocard].
photCL SCE 02 - 25445

Long Beach Steam Station, Plant #2
Visual Materials
Long Beach Steam Station, Plant #2 - Cracked flange on 11th stage heater [Plus three additional shots (#25421: cramped operating space around Unit 9, #25422: Progress construction of 8-R, & #25423: Unit #7 foundation) on same photocard].
photCL SCE 02 - 25420

Long Beach Steam Station, Plant #2
Visual Materials
Long Beach Steam Station, Plant #2 - Progress dismantling Unit #8. [Plus three additional Unit 8 shots (#24914: valve control board & drip pumps, #24915: deaerator vent pumps, & #24916: progress dismantling #8) on same photocard].
photCL SCE 02 - 24913