Long Beach Steam Station, Plant #2 - Cracked flange on 11th stage heater [Plus three additional shots (#25421: cramped operating space around Unit 9, #25422: Progress construction of 8-R, & #25423: Unit #7 foundation) on same photocard].
photCL SCE 02 - 25420

Long Beach Steam Station, Plant #2 - Forms & steel east footing 8-R
Visual Materials
Long Beach Steam Station, Plant #2 - Forms & steel east footing 8-R [Plus three additional shots - #25394: Removal of Unit 7, #25395: Construction progress, & #25396: Construction progress Unit 8-R) on same photocard].
photCL SCE 02 - 25393

Long Beach Steam Station, Plant #2
Visual Materials
Long Beach Steam Station, Plant #2 - Forms & steel, east footing of Unit 8-R [Plus three additional shots on construction of 8-R (#25414: progress 8-R, #25418: holes cut in concrete to remove material sent to Russia, & #25419: typical cement dust coating on Plant #2 equipment) on same photocard].
photCL SCE 02 - 25413

Long Beach Steam Station, Plant #2
Visual Materials
Long Beach Steam Station, Plant #2 - Progress dismantling Unit #8. [Plus three additional Unit 8 shots (#24914: valve control board & drip pumps, #24915: deaerator vent pumps, & #24916: progress dismantling #8) on same photocard].
photCL SCE 02 - 24913

Long Beach Steam Station, Plant #2
Visual Materials
Long Beach Steam Station, Plant #2 - Crating of Unit 8 100 ton stator for shipment to U.S.S.R. [Plus three additional shots (#25381 & #25382 : Unit 8R in progress, & #25383: moving house generator) on same photocard].
photCL SCE 02 - 25380

Long Beach Steam Station, Plant #2 - Unit 8-R
Visual Materials
Long Beach Steam Station, Plant #2 - Unit 8-R - Generator sole plates & low pressure end of turbine. [Plus additional shot (#25446: Unit 8-R construction progress) on same photocard].