Visual Materials
Southern Sierras' San Bernardino Substation was the operating nerve center of the system
You might also be interested in

Southern Sierras' handsome Brawley office, as it looked in 1928
Visual Materials
Southern Sierras' handsome Brawley office, as it looked in 1928. Pg. 135.
photCL SCE 11 - 00280

Southern Sierras' dispatcher's office at San Bernardino, about 1928
Visual Materials
Southern Sierras' dispatcher's office at San Bernardino, about 1928. Pg. 134
photCL SCE 11 - 00279
Image not available
San Bernardino Substation construction photographs and report
Visual Materials
Photograph report on the construction of the San Bernardino Substation and Operating building by Southern Sierras Power Company in 1928. Photographer: Southern Sierras Power Company.
photCL SCE

This frequency changer at Edison's Colton Substation was a major point of interconnection with Southern Sierras Power Company, prior to the frequency change
Visual Materials
This frequency changer at Edison's Colton Substation was a major point of interconnection with Southern Sierras Power Company, prior to the frequency change. Pg. 219.
photCL SCE 11 - 00438

A Southern Sierras line crew in the 1920s
Visual Materials
A Southern Sierras line crew in the 1920s. Pg. 131.
photCL SCE 11 - 00272
Image not available
Cloud-seeding operations by Southern Sierras Power Co
Visual Materials
Photograph report on cloud-seeding operations undertaken by Southern Sierras Power Company in 1948 to increase water storage for eastern Sierras' hydroelectric projects. Album includes U.S. Department of Commerce Weather Bureau, Research Paper No. 36 on Cloud Seeding Operations in the Bishop Creek, California Watershed.
photCL SCE