Visual Materials
A Southern Sierras line crew in the 1920s
You might also be interested in

A line crew in Southern California Edison's El Toro District
Visual Materials
A line crew in Southern California Edison's El Toro District. The woman's name is Karen Cavener. Pg. 3.
photCL SCE 11 - 00002

Southern Sierras' handsome Brawley office, as it looked in 1928
Visual Materials
Southern Sierras' handsome Brawley office, as it looked in 1928. Pg. 135.
photCL SCE 11 - 00280

Southern Sierras' dispatcher's office at San Bernardino, about 1928
Visual Materials
Southern Sierras' dispatcher's office at San Bernardino, about 1928. Pg. 134
photCL SCE 11 - 00279

Working over 150 feet above the desert floor, an Edison crew assembles a tower for the Vincent-Lugo transmission line
Visual Materials
Working over 150 feet above the desert floor, an Edison crew assembles a tower for the Vincent-Lugo transmission line. Pg. 223
photCL SCE 11 - 00450

Raising a pole by "horse-whim" during the building of the 55 kV line to Banning in 1913
Visual Materials
Raising a pole by "horse-whim" during the building of the 55 kV line to Banning in 1913. This was the first leg of Southern Sierras' extension into the Imperial Valley. Pg. 127
photCL SCE 11 - 00263

Southern Sierras' San Bernardino Substation was the operating nerve center of the system
Visual Materials
Southern Sierras' San Bernardino Substation was the operating nerve center of the system. Electricity from the Bishop Creek plants was routed through here on its way to the Imperial Valley. Pg. 135.
photCL SCE 11 - 00281